Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/29/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-1661
JOB ADDRESS:
3887 BROADMOOR WAY
FRISCO, TX 75033
DESC:   7988 AC, 10284 SF, SFR / 2 STORY
OWNER:
REYNOLDS SIGNATURE HOMES
PO BOX 2131
FRISCO TX 75034

CONTRACTOR:
REYNOLDS SIGNATURE HOMES
PO BOX 2131
FRISCO TX 75034
ISSUED DATE:
6/4/2013
APPLIED DATE:
5/13/2013
EXPIRED DATE:
2/25/2015
SITE APN:
D613052
STATUS:
COMPLETED
APPLICANT:
REYNOLDS SIGNATURE HOMES
PO BOX 2131
FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
595984.68
FEE SUMMARY
INSPECTION SUMMARY
FLATWORK 07/07/2014 ADE$30.00
ELECTRICAL FINAL 08/06/2014 ADE$30.00
1.5 INCH PD METER$185.00
SET 1 PD METER 06/06/2013 HDJ$80.00
PLUMBING ROUGH-IN 01/08/2014 CK$30.00
RESIDENTIAL ELECTRIC FEE$308.52
MISCELLANOUS MECHANICAL FEES$208.00
MISCELLANEOUS PLUMBING FEES$375.00
BUILDING PERMIT FEE$3,689.75
FENCE FEE$20.00
CREDIT CARD FEE$1.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.80
CREDIT CARD FEE$1.60
CREDIT CARD FEE$0.60
UTILITY / ROW 08/25/2014 KB$80.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
THOROUGHFARE IMPACT FEE$3,602.00
WATER IMPACT FEE$1,911.00
SEWER IMPACT FEE$1,553.00
FIRE DEPT INSPECTION FEES$308.52
PLUMBING ROUGH-IN 09/16/2013 TRC$30.00
GAS RELEASE 07/15/2014 TRC$30.00
PLUMBMECHFINAL 08/27/2014 TRC$30.00
Total Fees:$12,982.59
______  T-POLE
______  METER PAYMENT
______  SET 1 PD METER
______  PIER
______  MISC SLAB
______  FOOTINGS
______  FOOTINGS
______  SET 1 1/2 PD METER
______  PLUMBING ROUGH-IN
______  MISCFRAME
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  SHEATHING
______  BRICK/WALL TIES
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  INSULATION
______  SLAB
______  CAMERA
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING ROUGH-IN
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  MISCCO
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)