Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/8/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-1516
JOB ADDRESS:
6403 STALLION RANCH RD
FRISCO, TX
DESC:   3352 AC, 3966 SF, SFR / 2 STORY
OWNER:
HIGHLAND HOMES

PLANO TX 75024

CONTRACTOR:
HIGHLAND HOMES

PLANO TX 75024
ISSUED DATE:
5/10/2013
APPLIED DATE:
5/2/2013
EXPIRED DATE:
11/6/2013
SITE APN:
D561493
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES

PLANO TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
250092.72
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL FINAL 10/08/2013 ADE$30.00
ELECTRICAL FINAL 10/09/2013 ADE$30.00
SET 1 PD METER 05/14/2013 BS$80.00
MECHANICAL FINAL 10/23/2013 CK$30.00
PLUMBING ROUGH-IN 05/21/2013 GU$30.00
RESIDENTIAL ELECTRIC FEE$118.98
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$1,748.75
FENCE FEE$20.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
ELECTRICAL ROUGH IN 08/02/2013 RET$30.00
PLUMBING ROUGH-IN 05/23/2013 TRC$30.00
PLUMBING ROUGH-IN 05/29/2013 TRC$30.00
Total Fees:$3,041.73
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  INSULATION
______  2NDS/FRAMING
______  DRY WALL
______  BRICK/WALL TIES
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  MECHANICAL FINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)