Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/4/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-1415
JOB ADDRESS:
4153 FOREST PARK LN
FRISCO, TX 75033
DESC:   5315 AC, 6617 SF, SFR / 2 STORY
OWNER:
M CHRISTOPHER CUSTOM HOMES

FAIRVIEW TX 75069

CONTRACTOR:
M CHRISTOPHER CUSTOM HOMES

FAIRVIEW TX 75069
ISSUED DATE:
5/15/2013
APPLIED DATE:
4/25/2013
EXPIRED DATE:
11/11/2013
SITE APN:
D296534
STATUS:
COMPLETED
APPLICANT:
M CHRISTOPHER CUSTOM HOMES

FAIRVIEW TX 75069
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
368871.84
FEE SUMMARY
INSPECTION SUMMARY
CAMERA 07/16/2013 CB$30.00
PLUMBTOPOUT/MECHRGH 09/26/2013 CK$30.00
SHEATHING 09/26/2013 CW$30.00
CREDIT CARD FEE$3.00
2NDS/FRAMING 10/04/2013 JBS$30.00
2NDS/FRAMING 10/07/2013 JBS$30.00
INSULATION 10/15/2013 JBS$30.00
INSULATION 10/16/2013 JBS$30.00
FLATWORK 12/13/2013 JBS$30.00
PLAN REVIEW FEE$50.00
RESIDENTIAL ELECTRIC FEE$195.84
MISCELLANOUS MECHANICAL FEES$156.00
MISCELLANEOUS PLUMBING FEES$263.00
BUILDING PERMIT FEE$2,338.75
FENCE FEE$20.00
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$50.00
RESIDENTIAL ELECTRIC FEE$2.67
MISCELLANEOUS BUILDING PERMIT FEES$39.16
MISCELLANOUS MECHANICAL FEES$6.50
MISCELLANEOUS PLUMBING FEES$14.00
PLAN REVIEW FEE$50.00
PLUMBMECHFINAL 12/23/2013 JTH$30.00
PLUMBING ROUGH-IN 06/25/2013 JWI$30.00
PLUMBING ROUGH-IN 06/28/2013 JWI$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
CREDIT CARD FEE$1.20
DRY WALL 10/28/2013 MC$30.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
FIRE DEPT INSPECTION FEES$200.22
PLUMBING ROUGH-IN 07/01/2013 TRC$30.00
Total Fees:$4,805.34
______  T-POLE
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  BRICK/WALL TIES
______  AUTOFIRE SPRK VISUAL
______  AUTOFIRE SPRK HYDRO
______  PLUMBTOPOUT AND MECHRGH
______  BRICK/WALL TIES
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FLATWORK
______  FLATWORK
______  WATER REGISTER
______  ELECTRICAL FINAL
______  BRICK/WALL TIES
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  GAS RELEASE
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  FLATWORK
______  FLATWORK
______  INSULATION
______  DRY WALL
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  AUTOFIRE SPRK VISUAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)