|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/19/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-1223
|
JOB ADDRESS: 4156 VISTA TERRACE DR FRISCO, TX |
DESC:
3154 AC, 3823 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
IRVING TX 75063
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 4/25/2013
APPLIED DATE:4/15/2013
EXPIRED DATE:10/22/2013
SITE APN:D562361
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 235319.94
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
PLUMBMECHFINAL 10/01/2013 CK | $30.00 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.60 |
RESIDENTIAL ELECTRIC FEE | $114.69 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,673.75 |
FENCE FEE | $20.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
2NDS/FRAMING 07/15/2013 TW | $30.00 |
2NDS/FRAMING 07/19/2013 TW | $30.00 |
INSULATION 07/29/2013 TW | $30.00 |
INSULATION 07/31/2013 TW | $30.00 |
FLATWORK 08/27/2013 TW | $30.00 |
Total Fees: | $3,342.54 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ WATER REGISTER |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|