APPROVED DATE: 5/29/2013 PERMIT SUB-TYPE: SCHL PERMIT NO: B13-1161
JOB ADDRESS:
12333 BRIAR RIDGE RD
FRISCO, TX
DESC:   88332 SQ FT, SCHL / JAMES R NEWMAN ELEMENTARY SCHOOL
OWNER:
FRISCO ISD

FRISCO TX 75035

CONTRACTOR:
RATCLIFF CONSTRUCTORS
REC'VD VALID
ADDISON TX 75001
ISSUED DATE:
5/31/2013
APPLIED DATE:
4/5/2013
EXPIRED DATE:
12/10/2014
SITE APN:
D296925
STATUS:
COMPLETED
APPLICANT:
SHW GROUP

PLANO TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
12500000
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL ROUGH IN 02/04/2014 JB$35.00
ELECTRICAL ROUGH IN 02/06/2014 JB$35.00
ELECTRICAL ROUGH IN 02/24/2014 JB$35.00
PLUMBING FINAL 05/12/2014 KSH$35.00
4 INCH COMP METER$3,000.00
WATER METER DEPOSIT COMMERCIAL$1,100.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$150.00
MISCELLANOUS MECHANICAL FEES$3,300.76
MISCELLANEOUS PLUMBING FEES$2,475.57
COMMERCIAL ELECTRIC FEE$3,533.28
COMMERCIAL BUILDING PERMIT FEE$25,102.14
SATURDAY WORK FEES$150.00
CREDIT CARD FEE$1.00
FIRE DEPT INSPECTION FEES$2,649.96
FIRE DEPT INSPECTION FEES$400.00
WATER 08/06/2013 TRC$35.00
Total Fees:$42,087.71
______  UNDRGR FIRE MAIN VIS
______  WATER
______  UNDRGR FIRE MAIN VIS
______  WATER
______  UNDRGR FIRE MAIN HYD
______  PIER
______  FOOTINGS
______  ELECTRICAL ROUGH IN
______  PAVING
______  PAVING
______  FOOTINGS
______  ELECTRICAL ROUGH IN
______  PAVING
______  FOOTINGS
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PAVING
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  MISC
______  PLUMBING ROUGH-IN
______  FOOTINGS
______  PLUMBING ROUGH-IN
______  TILT WALL PANELS
______  FOOTINGS
______  COMM SLAB
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  TILT WALL PANELS
______  PLUMBING ROUGH-IN
______  FOOTINGS
______  COMM SLAB
______  GREASE TRAP
______  PLUMBING ROUGH-IN
______  TILT WALL PANELS
______  COMM SLAB
______  UNDRGR FIRE MAIN FLU
______  UNDRGR FIRE MAIN HYD
______  PLUMBING ROUGH-IN
______  TILT WALL PANELS
______  COMM SLAB
______  COMM SLAB
______  TILT WALL PANELS
______  COMM SLAB
______  TILT WALL PANELS
______  COMM SLAB
______  TILT WALL PANELS
______  TILT WALL PANELS
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  COMM FRAME
______  ELEC WALL
______  COMM FRAME
______  ELEC WALL
______  COMM FRAME
______  PLUMBING ROUGH-IN
______  COMM PLUMB TOP OUT
______  BRICK/WALL TIES
______  COMM FRAME
______  BRICK/WALL TIES
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  INSULATION
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  INSULATION
______  BRICK
______  COMM PLUMB TOP OUT
______  AUTOFIRE SPRK VISUAL
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  BRICK
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  ELECTRICAL ROUGH IN
______  COMM FRAME
______  COMM FRAME
______  COMM PLUMB TOP OUT
______  COMM SLAB
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  AUTOFIRE SPRK PARTI
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  COMM FRAME
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  ELECTRICAL RELEASE
______  MECHANICAL ROUGH
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  CEILING
______  MECHANICAL ROUGH
______  4 PD METER
______  METER PAYMENT
______  LATH
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL ROUGH IN
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  GAS PRESSURE
______  ELECTRICAL ROUGH IN
______  GAS RELEASE
______  ELECTRICAL ROUGH IN
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  PLUMBING FINAL
______  COMM PLUMB TOP OUT
______  CEILING
______  ELECTRICAL ROUGH IN
______  PLUMBING FINAL
______  HEALTH FINAL
______  MECHANICAL FINAL
______  FLATWORK
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  LIFESAFETY
______  COMM FRAME
______  ELECTRICAL FINAL
______  LIFESAFETY
______  ELECTRICAL FINAL
______  FIRE FINAL
______  LANDSCAPE
______  COMM CO
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)