BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/4/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-1073
|
JOB ADDRESS: 2168 DAMPTON DR FRISCO, TX 75033 |
DESC:
4068 AC, 5054 SF, SFR / 2 STORY |
|
OWNER:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
CONTRACTOR:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
ISSUED DATE: 4/8/2013
APPLIED DATE:4/2/2013
EXPIRED DATE:10/5/2013
SITE APN:D524365
STATUS:COMPLETED
|
|
APPLICANT:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 303513.48
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $151.62 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
BUILDING PERMIT FEE | $2,013.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.80 |
PLUMBING ROUGH-IN 04/22/2013 JWI | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
THOROUGHFARE IMPACT FEE | $1,952.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
SLAB 05/01/2013 REED | $30.00 |
2NDS/FRAMING 06/14/2013 REED | $30.00 |
GAS RELEASE 08/14/2013 TRC | $30.00 |
PLUMBING FINAL 08/26/2013 TRC | $30.00 |
PLUMBING FINAL 08/27/2013 TRC | $30.00 |
Total Fees: | $6,102.97 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 5/8 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ LATH |
______ LATH |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|