APPROVED DATE: 4/3/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-1060
|
JOB ADDRESS: 5171 LINDA LN FRISCO, TX 75033 |
DESC:
3790 AC, 4621 SF, SFR / 2 STORY |
|
OWNER:
BEAZER HOMES
SUITE 200 DALLAS TX 75234
|
CONTRACTOR:
BEAZER HOMES
SUITE 200 DALLAS TX 75234
|
ISSUED DATE: 4/9/2013
APPLIED DATE:4/1/2013
EXPIRED DATE:10/6/2013
SITE APN:D468595
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
SUITE 200 DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 282771.9
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
RESIDENTIAL ELECTRIC FEE | $138.63 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $1,908.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 06/21/2013 GDS | $30.00 |
PLUMBTOPOUT/MECHRGH 06/18/2013 JTH | $30.00 |
PLUMBING ROUGH-IN 04/22/2013 JWI | $30.00 |
PLUMBTOPOUT/MECHRGH 06/07/2013 JWI | $30.00 |
CREDIT CARD FEE | $0.60 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
INSULATION 07/01/2013 REED | $30.00 |
ELECTRICAL FINAL 08/19/2013 REED | $30.00 |
Total Fees: | $6,575.98 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|