Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/1/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-0970
JOB ADDRESS:
5011 HAVASU DR
FRISCO, TX 75034
DESC:   4129 AC, 4858 SF, SFR / 2 STORY
OWNER:
MERITAGE HOMES

IRVING TX 75038

CONTRACTOR:
MERITAGE HOMES

IRVING TX 75038
ISSUED DATE:
4/8/2013
APPLIED DATE:
3/26/2013
EXPIRED DATE:
10/5/2013
SITE APN:
D561977
STATUS:
COMPLETED
APPLICANT:
MERITAGE HOMES

IRVING TX 75038
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
308064.69
FEE SUMMARY
INSPECTION SUMMARY
CO/BUILDING FINAL 09/09/2013 JBS$30.00
RESIDENTIAL ELECTRIC FEE$145.74
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$274.00
BUILDING PERMIT FEE$2,038.75
FENCE FEE$20.00
GAS RELEASE 08/14/2013 JTH$30.00
UTILITY / ROW 09/03/2013 KB$20.00
UTILITY / ROW 09/03/2013 KB$60.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
THOROUGHFARE IMPACT FEE$3,960.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
PLUMBING ROUGH-IN 04/24/2013 TRC$30.00
PLUMBTOPOUT/MECHRGH 06/12/2013 TW$30.00
ELECTRICAL ROUGH IN 06/14/2013 TW$30.00
INSULATION 06/21/2013 TW$30.00
FLATWORK 08/06/2013 TW$30.00
ELECTRICAL FINAL 08/12/2013 TW$30.00
Total Fees:$10,760.49
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  LATH
______  INSULATION
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)