|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/25/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0857
|
JOB ADDRESS: 10245 TORINO FRISCO, TX 75035 |
DESC:
4159 AC, 5174 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS CUSTOM HOMES
SUITE 500 DALLAS TX 75201
|
CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
SUITE 500 DALLAS TX 75201
|
ISSUED DATE: 4/4/2013
APPLIED DATE:3/18/2013
EXPIRED DATE:10/1/2013
SITE APN:C2650191
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS CUSTOM HOMES
SUITE 500 DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 310302.99
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
1 INCH PD METER | $400.00 |
ELECTRICAL FINAL 07/19/2013 GDS | $30.00 |
SLAB 04/23/2013 GLQ | $30.00 |
2NDS/FRAMING 05/30/2013 GLQ | $30.00 |
INSULATION 06/05/2013 GLQ | $30.00 |
BRICK/WALL TIES 06/20/2013 GLQ | $30.00 |
DRY WALL 06/10/2013 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $155.22 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $2,048.75 |
FENCE FEE | $20.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
GAS RELEASE 07/19/2013 MC | $30.00 |
PLUMBTOPOUT/MECHRGH 05/24/2013 PDC | $30.00 |
Total Fees: | $11,178.97 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ SET 1 PD METER |
______ METER PAYMENT |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|