|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/22/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0788
|
JOB ADDRESS: 13162 COURTNEY DR FRISCO, TX 75033 |
DESC:
3195 AC, 3636 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 3/28/2013
APPLIED DATE:3/13/2013
EXPIRED DATE:2/14/2014
SITE APN:D619406
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 238378.95
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
DRY WALL 08/08/2013 ADE | $30.00 |
CAMERA 04/26/2013 CB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $109.08 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
BUILDING PERMIT FEE | $1,688.75 |
FENCE FEE | $20.00 |
ELECTRICAL ROUGH IN 07/09/2013 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.40 |
PLUMBING ROUGH-IN 04/12/2013 GU | $30.00 |
PLUMBMECHFINAL 10/08/2013 JTH | $30.00 |
PLUMBMECHFINAL 10/22/2013 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 06/20/2013 JWI | $30.00 |
PLUMBTOPOUT/MECHRGH 06/27/2013 JWI | $30.00 |
PLUMBMECHFINAL 10/04/2013 KSH | $30.00 |
THOROUGHFARE IMPACT FEE | $858.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
SHEATHING 06/14/2013 REED | $30.00 |
PLUMBTOPOUT/MECHRGH 07/02/2013 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 07/10/2013 TRC | $30.00 |
Total Fees: | $7,327.13 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|