|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/8/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0593
|
JOB ADDRESS: 3647 COPPER POINT LN FRISCO, TX |
DESC:
3918 AC, 4654 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS CUSTOM HOMES
SUITE 500 DALLAS TX 75201
|
CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
SUITE 500 DALLAS TX 75201
|
ISSUED DATE: 3/19/2013
APPLIED DATE:2/28/2013
EXPIRED DATE:9/15/2013
SITE APN:D556438
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS CUSTOM HOMES
SUITE 500 DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 292321.98
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 04/10/2013 CB | $30.00 |
CAMERA 05/01/2013 CB | $30.00 |
SLAB 04/08/2013 CW | $30.00 |
DRY WALL 05/24/2013 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
CREDIT CARD FEE | $0.60 |
RESIDENTIAL ELECTRIC FEE | $139.62 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
FENCE FEE | $20.00 |
2NDS/FRAMING 05/13/2013 JKT | $30.00 |
GAS RELEASE 07/12/2013 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $3,960.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
FLATWORK 08/06/2013 RET | $30.00 |
PLUMBTOPOUT/MECHRGH 05/08/2013 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 05/09/2013 TRC | $30.00 |
Total Fees: | $8,631.72 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|