|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/6/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0552
|
JOB ADDRESS: 13429 GRAND ARBOR FRISCO, TX |
DESC:
3519 AC, 4387 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 3/14/2013
APPLIED DATE:2/26/2013
EXPIRED DATE:9/10/2013
SITE APN:C2682855
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 262552.59
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
INSULATION 05/09/2013 GLQ | $30.00 |
RESIDENTIAL ELECTRIC FEE | $131.61 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,808.75 |
FENCE FEE | $20.00 |
PLUMBTOPOUT/MECHRGH 04/30/2013 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 05/01/2013 JTH | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,553.00 |
Total Fees: | $8,727.86 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ MISC PLUMB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ LATH |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|