BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/28/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0511
|
JOB ADDRESS: 13830 MYATT FRISCO, TX |
DESC:
5042 AC, 5994 SF, SFR / 2 STORY |
|
OWNER:
NEWCASTLE HOMES
DALLAS TX 75225
|
CONTRACTOR:
NEWCASTLE HOMES
DALLAS TX 75225
|
ISSUED DATE: 3/11/2013
APPLIED DATE:2/21/2013
EXPIRED DATE:9/7/2013
SITE APN:C2682547
STATUS:COMPLETED
|
|
APPLICANT:
NEWCASTLE HOMES
DALLAS TX 75225
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 376183.62
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
PLUMBTOPOUT/MECHRGH 06/17/2013 CK | $30.00 |
PLUMBTOPOUT/MECHRGH 06/25/2013 CK | $30.00 |
RESIDENTIAL ELECTRIC FEE | $179.82 |
MISCELLANOUS MECHANICAL FEES | $149.00 |
MISCELLANEOUS PLUMBING FEES | $309.00 |
BUILDING PERMIT FEE | $2,378.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.80 |
FLATWORK 08/26/2013 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 06/20/2013 GU | $30.00 |
2NDS/FRAMING 06/27/2013 JBS | $30.00 |
PLUMBING ROUGH-IN 03/14/2013 JTH | $30.00 |
PLUMBMECHFINAL 09/24/2013 KSH | $30.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
Total Fees: | $9,618.77 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ 2NDS/FRAMING |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|