APPROVED DATE: 3/7/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-0432
JOB ADDRESS:
1729 PRINCE WILLIAM LN
FRISCO, TX 75034
DESC:   4350 AC, 6114 SF, SFR / 2 STORY
OWNER:
MURPHY BUILDING C
PO BOX 866004
Plano TX 75086

CONTRACTOR:
MURPHY CUSTOM HOMES
P O BOX 701984
DALLAS TX 75370
ISSUED DATE:
3/11/2013
APPLIED DATE:
2/15/2013
EXPIRED DATE:
9/7/2013
SITE APN:
D239889
STATUS:
COMPLETED
APPLICANT:
MURPHY CUSTOM HOMES
P O BOX 701984
DALLAS TX 75370
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
324553.5
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$1.80
CREDIT CARD FEE$1.80
CREDIT CARD FEE$0.60
PLUMBMECHFINAL 04/07/2014 GU$30.00
PLAN REVIEW FEE$50.00
RESIDENTIAL ELECTRIC FEE$183.42
MISCELLANOUS MECHANICAL FEES$162.50
MISCELLANEOUS PLUMBING FEES$284.00
BUILDING PERMIT FEE$2,118.75
FENCE FEE$20.00
PLUMBTOPOUT/MECHRGH 07/15/2013 JTH$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
T-HEAT 01/27/2014 KSH$30.00
14X18 METER BOX BLDR$110.00
FIRE DEPT INSPECTION FEES$183.42
PLUMBING ROUGH-IN 04/22/2013 TRC$30.00
PLUMBING ROUGH-IN 04/23/2013 TRC$30.00
PLUMBING ROUGH-IN 04/24/2013 TRC$30.00
SLAB 05/06/2013 TW$30.00
2NDS/FRAMING 07/31/2013 TW$30.00
Total Fees:$3,831.29
______  T-POLE
______  PIER
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  SHEATHING
______  AUTOFIRE SPRK VISUAL
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  LATH
______  DRY WALL
______  BRICK/WALL TIES
______  GAS RELEASE
______  FLATWORK
______  T-HEAT
______  GAS RELEASE
______  T-HEAT
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  MECHANICAL FINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)