Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/22/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-0428
JOB ADDRESS:
6513 JAMESTOWN
FRISCO, TX
DESC:   5818 AC, 6617 SF, SFR / 2 STORY
OWNER:
TOLL BROTHERS INC

GRAPEVINE PKWY 100

CONTRACTOR:
TOLL BROTHERS INC

GRAPEVINE PKWY 100
ISSUED DATE:
2/27/2013
APPLIED DATE:
2/15/2013
EXPIRED DATE:
8/26/2013
SITE APN:
C2684412
STATUS:
COMPLETED
APPLICANT:
TOLL BROTHERS INC

GRAPEVINE PKWY 100
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
434080.98
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
SLAB 03/19/2013 CW$30.00
CREDIT CARD FEE$0.60
RESIDENTIAL ELECTRIC FEE$198.51
MISCELLANOUS MECHANICAL FEES$169.00
MISCELLANEOUS PLUMBING FEES$291.00
BUILDING PERMIT FEE$2,668.75
FENCE FEE$20.00
PLUMBING FINAL 07/29/2013 KSH$30.00
THOROUGHFARE IMPACT FEE$2,502.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
FIRE DEPT INSPECTION FEES$198.51
Total Fees:$9,974.37
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  AUTOFIRE SPRK HYDRO
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  FLATWORK
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)