BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/18/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0393
|
JOB ADDRESS: 11389 GRAPEVINE LN FRISCO, TX 75035 |
DESC:
3809 AC, 4618 SF, SFR / 2 STORY |
|
OWNER:
AMERICAN LEGEND HOMES
SUITE 222 LEWISVILLE TX 75056
|
CONTRACTOR:
AMERICAN LEGEND HOMES
SUITE 222 LEWISVILLE TX 75056
|
ISSUED DATE: 2/20/2013
APPLIED DATE:2/11/2013
EXPIRED DATE:8/19/2013
SITE APN:ADD85217
STATUS:COMPLETED
|
|
APPLICANT:
AMERICAN LEGEND HOMES
SUITE 222 LEWISVILLE TX 75056
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 284189.49
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $138.54 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,918.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.20 |
2NDS/FRAMING 04/18/2013 GLQ | $30.00 |
BRICK/WALL TIES 05/01/2013 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 04/16/2013 JBS | $30.00 |
2NDS/FRAMING 04/19/2013 JKT | $30.00 |
GAS RELEASE 07/11/2013 JWI | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
PLUMBING FINAL 07/05/2013 TW | $30.00 |
Total Fees: | $10,582.89 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|