Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/7/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-0311
JOB ADDRESS:
7144 ST PHILS
FRISCO, TX
DESC:   3952 AC, 4832 SF, SFR / 2 STORY
OWNER:
LANDON HOMES

PLANO TX 75093

CONTRACTOR:
LANDON HOMES

PLANO TX 75093
ISSUED DATE:
3/5/2013
APPLIED DATE:
2/4/2013
EXPIRED DATE:
9/1/2013
SITE APN:
C2683146
STATUS:
COMPLETED
APPLICANT:
LANDON HOMES

PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
294858.72
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
CREDIT CARD FEE$0.60
CO/BUILDING FINAL 07/02/2013 GLQ$30.00
RESIDENTIAL ELECTRIC FEE$144.96
MISCELLANOUS MECHANICAL FEES$129.50
MISCELLANEOUS PLUMBING FEES$239.00
BUILDING PERMIT FEE$1,968.75
FENCE FEE$20.00
THOROUGHFARE IMPACT FEE$2,502.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
Total Fees:$8,900.81
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  SHEATHING
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  SHEATHING
______  SHEATHING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)