|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/14/2013
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B13-0303
|
JOB ADDRESS: 2611 INTERNET BLVD 105 FRISCO, TX 75034 |
DESC:
8577 SQ FT, CIFO / CONWAY MULTIMODEL |
|
OWNER:
HALL G2 LLC
FRISCO TX 75034-8557
|
CONTRACTOR:
JJ CLEMENTS CONSTRUCTION INC
RICHARDSON TX 75080
|
ISSUED DATE: 2/18/2013
APPLIED DATE:1/30/2013
EXPIRED DATE:8/17/2013
SITE APN:C2137130
STATUS:EXPIRED
|
|
APPLICANT:
JJ CLEMENTS CONSTRUCTION INC
RICHARDSON TX 75080
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 80000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 03/22/2013 JDSM | $35.00 |
CREDIT CARD FEE | $1.40 |
FIRE DEPT INSPECTION FEES | $257.31 |
MISCELLANOUS MECHANICAL FEES | $195.04 |
MISCELLANEOUS PLUMBING FEES | $171.54 |
COMMERCIAL ELECTRIC FEE | $343.08 |
COMMERCIAL BUILDING PERMIT FEE | $512.25 |
FIRE DEPT INSPECTION FEES | $50.00 |
FIRE DEPT 1ST INSP FAILED FEE | $50.00 |
FIRE DEPT INSPECTION FEES | $100.00 |
CEILING 03/07/2013 TW | $35.00 |
Total Fees: | $1,750.62 |
|
|
| ______ COMM PLUMB TOP OUT |
______ ELECTRICAL ROUGH IN |
______ COMM FRAME |
______ COMMDRYWALL |
______ COMM SLAB |
______ MECHANICAL ROUGH |
______ CEILING |
______ MECHANICAL ROUGH |
______ AUTOFIRE SPRK VISUAL |
______ CEILING |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ FIRE FINAL |
______ COMM CO |
______ FIRE FINAL |
______ ACCESS CONTROL ACCEP |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|