|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/4/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0234
|
JOB ADDRESS: 10929 CARDIFF FRISCO, TX |
DESC:
3226 AC, 3995 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
PLANO TX 75024
|
ISSUED DATE: 2/12/2013
APPLIED DATE:1/28/2013
EXPIRED DATE:8/11/2013
SITE APN:C2678111
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 240691.86
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
DRY WALL 04/01/2013 GLQ | $30.00 |
PLUMBING FINAL 04/25/2013 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $119.85 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
BUILDING PERMIT FEE | $1,698.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $30.00 |
1 INCH PD METER | $400.00 |
WATER METER DEPOSIT | $30.00 |
WATER METER DEPOSIT | $15.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
Total Fees: | $10,179.60 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ LATH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|