Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/30/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-0167
JOB ADDRESS:
1719 SADDLE TREE ROAD
FRISCO, TX
DESC:   3801 AC, 4597 SF, SFR / 2 STORY
OWNER:
K HOVNANIAN HOMES

PLANO TX 75093

CONTRACTOR:
K HOVNANIAN HOMES

PLANO TX 75093
ISSUED DATE:
2/4/2013
APPLIED DATE:
1/22/2013
EXPIRED DATE:
8/3/2013
SITE APN:
STATUS:
COMPLETED
APPLICANT:
K HOVNANIAN HOMES

PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
283592.61
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
CAMERA 02/18/2013 CB$30.00
CAMERA 03/19/2013 CB$30.00
2NDS/FRAMING 04/02/2013 CW$30.00
CREDIT CARD FEE$3.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
PLUMBING ROUGH-IN 02/05/2013 JBS$30.00
RESIDENTIAL ELECTRIC FEE$137.91
MISCELLANOUS MECHANICAL FEES$129.50
MISCELLANEOUS PLUMBING FEES$239.00
BUILDING PERMIT FEE$1,913.75
FENCE FEE$20.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
SLAB 02/14/2013 MC$30.00
T-POLE 02/07/2013 REED$30.00
CO/BUILDING FINAL 07/25/2013 RET$30.00
PLUMBING FINAL 06/05/2013 TRC$30.00
Total Fees:$3,159.96
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  T-POLE
______  SLAB
______  SLAB
______  CAMERA
______  CAMERA
______  ELECTRICAL ROUGH IN
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  PLUMBING ROUGH-IN
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)