BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/16/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B13-0053
|
JOB ADDRESS: 4474 WHISPERING LAKE DR FRISCO, TX 75036 |
DESC:
4689 AC, 5999 SF, SFR / 2 STORY |
|
OWNER:
MCCAMEY, KENDALL & REGAN
FRISCO TX 75036
|
CONTRACTOR:
LANDON HOMES
PLANO TX 75093
|
ISSUED DATE: 2/26/2013
APPLIED DATE:1/9/2013
EXPIRED DATE:8/25/2013
SITE APN:ADD82801
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 349846.29
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
PLUMBING ROUGH-IN 03/18/2013 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $179.97 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
BUILDING PERMIT FEE | $2,243.75 |
FENCE FEE | $20.00 |
PLUMBTOPOUT/MECHRGH 04/30/2013 JTH | $30.00 |
GAS RELEASE 07/22/2013 JTH | $30.00 |
PLUMBING FINAL 08/14/2013 JTH | $30.00 |
DRY WALL 06/10/2013 JWI | $30.00 |
WATER IMPACT FEE | $1,375.00 |
SEWER IMPACT FEE | $1,553.00 |
PLUMBTOPOUT/MECHRGH 05/03/2013 TRC | $30.00 |
SHEATHING 04/30/2013 TW | $30.00 |
2NDS/FRAMING 05/07/2013 TW | $30.00 |
2NDS/FRAMING 05/17/2013 TW | $30.00 |
INSULATION 05/29/2013 TW | $30.00 |
DRY WALL 06/05/2013 TW | $30.00 |
FLATWORK 07/01/2013 TW | $30.00 |
ELECTRICAL FINAL 07/22/2013 TW | $30.00 |
ELECTRICAL FINAL 07/24/2013 TW | $30.00 |
Total Fees: | $6,671.12 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ MISC |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|