Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/10/2013 PERMIT SUB-TYPE: SNEW PERMIT NO: B13-0016
JOB ADDRESS:
6684 STALLION RANCH RD
FRISCO, TX
DESC:   4258 AC, 5482 SF, SFR / 2 STORY
OWNER:
DREES CUSTOM HOMES

IRVING TX 75038

CONTRACTOR:
DREES CUSTOM HOMES

IRVING TX 75038
ISSUED DATE:
1/17/2013
APPLIED DATE:
1/4/2013
EXPIRED DATE:
12/13/2013
SITE APN:
D561433
STATUS:
COMPLETED
APPLICANT:
DREES CUSTOM HOMES

IRVING TX 75038
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
315078.03
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL FINAL 10/01/2013 ADE$30.00
PLUMBTOPOUT/MECHRGH 08/01/2013 CK$30.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.80
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.60
RESIDENTIAL ELECTRIC FEE$163.41
MISCELLANOUS MECHANICAL FEES$156.00
MISCELLANEOUS PLUMBING FEES$246.00
BUILDING PERMIT FEE$2,073.75
FENCE FEE$20.00
PLAN REVIEW FEE$50.00
PLAN REVIEW FEE$50.00
PLUMBTOPOUT/MECHRGH 07/26/2013 JTH$30.00
UTILITY / ROW 10/21/2013 KB$80.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
T-POLE 03/29/2013 REED$30.00
ELECTRICAL ROUGH IN 07/29/2013 RET$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
PLUMBING ROUGH-IN 04/24/2013 TRC$30.00
CREDIT CARD FEE$0.60
Total Fees:$3,454.36
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)