BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/3/2013
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-3660
|
JOB ADDRESS: 1441 TALLEY LN FRISCO, TX 75033 |
DESC:
4182 AC, 5071 SF, SFR / 2 STORY |
|
OWNER:
SUMEER HOMES
IRVING TX 75062
|
CONTRACTOR:
SUMEER HOMES
IRVING TX 75062
|
ISSUED DATE: 1/9/2013
APPLIED DATE:12/27/2012
EXPIRED DATE:7/8/2013
SITE APN:D620271
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 312019.02
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 02/11/2013 CB | $30.00 |
CREDIT CARD FEE | $4.40 |
SLAB 02/07/2013 GDS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $152.13 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $2,058.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS BUILDING PERMIT FEES | $72.86 |
PLUMBING FINAL 06/18/2013 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 04/03/2013 JWI | $30.00 |
PLUMBTOPOUT/MECHRGH 04/09/2013 JWI | $30.00 |
PLUMBING FINAL 06/28/2013 JWI | $30.00 |
UTILITY / ROW 06/25/2013 KM | $80.00 |
UTILITY / ROW 06/28/2013 KB | $80.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $400.00 |
THOROUGHFARE IMPACT FEE | $1,952.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
2NDS/FRAMING 04/12/2013 REED | $30.00 |
Total Fees: | $6,398.64 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ ELECTRICAL ROUGH IN |
______ MISC PLUMB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|