Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/28/2012 PERMIT SUB-TYPE: SNEW PERMIT NO: B12-3607
JOB ADDRESS:
7577 TRULL BROOK LN
FRISCO, TX 75034
DESC:   1525 AC, 2154 SF, SFR / 1 STORY
OWNER:
PULTE HOMES

IRVING TX 75063

CONTRACTOR:
PULTE HOMES

IRVING TX 75063
ISSUED DATE:
1/4/2013
APPLIED DATE:
12/17/2012
EXPIRED DATE:
7/3/2013
SITE APN:
D537389
STATUS:
COMPLETED
APPLICANT:
PULTE HOMES

IRVING TX 75063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
113780.25
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL ELECTRIC FEE$64.62
MISCELLANOUS MECHANICAL FEES$96.50
MISCELLANEOUS PLUMBING FEES$181.00
BUILDING PERMIT FEE$1,063.75
FENCE FEE$20.00
PLUMBING FINAL 04/17/2013 GU$30.00
FLATWORK 03/27/2013 JKT$30.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
Total Fees:$1,915.87
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  LATH
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)