|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/21/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-3271
|
JOB ADDRESS: 6874 THISTLEWOOD LN FRISCO, TX 75034 |
DESC:
4139 AC, 4923 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES LTD
PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES LTD
PLANO TX 75093
|
ISSUED DATE: 11/29/2012
APPLIED DATE:11/12/2012
EXPIRED DATE:5/28/2013
SITE APN:D297799
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 308810.79
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $147.69 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $281.00 |
BUILDING PERMIT FEE | $2,038.75 |
FENCE FEE | $20.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $1.20 |
PLUMBTOPOUT/MECHRGH 01/22/2013 JBS | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
SLAB 12/17/2012 REED | $30.00 |
PLUMBING ROUGH-IN 12/03/2012 TRC | $30.00 |
PLUMBING ROUGH-IN 12/12/2012 TRC | $30.00 |
PLUMBING FINAL 04/18/2013 TRC | $30.00 |
PLUMBING FINAL 04/19/2013 TRC | $30.00 |
Total Fees: | $3,753.54 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ WATER REGISTER |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|