APPROVED DATE: 2/7/2013 PERMIT SUB-TYPE: CNEW PERMIT NO: B12-3268
JOB ADDRESS:
303 MAIN ST
FRISCO, TX 75034
DESC:   9800 SQ FT, CNEW / FAMILY FITNESS GYM DBA TEXAS FAMILY FITNE
OWNER:
MAIN FM 423 LLC

CARROLLTON TX 75006

CONTRACTOR:
ALSAL CONSTRUCTION INC

DALLAS TX 75229
ISSUED DATE:
2/7/2013
APPLIED DATE:
11/8/2012
EXPIRED DATE:
8/6/2013
SITE APN:
D254702
STATUS:
COMPLETED
APPLICANT:
ALSAL CONSTRUCTION INC

DALLAS TX 75229
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
600000
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
2 INCH PD METER$705.00
COMM PLUMB TOP OUT 04/17/2013 GU$35.00
MECHANICAL FINAL 06/10/2013 JB$35.00
ELECTRICAL RELEASE 05/10/2013 JDSM$35.00
SEWER IMPACT FEE$12,950.00
WATER IMPACT FEE$14,174.00
THOROUGHFARE IMPACT FEE$0.00
FIRE DEPT INSPECTION FEES$274.32
MISCELLANOUS MECHANICAL FEES$522.00
MISCELLANEOUS PLUMBING FEES$67.50
COMMERCIAL ELECTRIC FEE$590.00
COMMERCIAL BUILDING PERMIT FEE$2,225.25
PLAN REVIEW FEE$100.00
MISCELLANEOUS PLUMBING FEES$142.50
FIRE DEPT INSPECTION FEES$0.00
PLUMBING ROUGH-IN 04/16/2013 TRC$35.00
PLUMBING TOP OUT 04/18/2013 TRC$35.00
PLUMBING ROUGH-IN 05/02/2013 TRC$35.00
INSULATION 04/18/2013 TW$35.00
CEILING 05/08/2013 TW$35.00
DOUBLE CHECK 06/03/2013 TW$35.00
MECHANICAL FINAL 06/03/2013 TW$35.00
PLUMBING FINAL 06/03/2013 TW$35.00
Total Fees:$32,210.57
______  PIER
______  PIER
______  PIER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL
______  PRE POUR INSP
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  MISC
______  SHEATHING
______  SHEATHING
______  BRICK/WALL TIES
______  ELECTRICAL ROUGH IN
______  COMM FRAME
______  PLUMBING ROUGH-IN
______  COMM PLUMB TOP OUT
______  INSULATION
______  PLUMBING TOP OUT
______  COMM PLUMB TOP OUT
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  ELECTRICAL ROUGH IN
______  INSULATION
______  DRY WALL
______  PLUMBING ROUGH-IN
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  PLUMBING ROUGH-IN
______  CEILING
______  CEILING
______  ELECTRICAL RELEASE
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL RELEASE
______  METER PAYMENT
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  SET 2 PD METER
______  ELECTRICAL FINAL
______  GAS PRESSURE
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  DOUBLE CHECK
______  GAS RELEASE
______  DOUBLE CHECK
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  MISCCO
______  MECHANICAL FINAL
______  COMM CO
______  FIRE FINAL
______  COMM CO
______  FIRE FINAL
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)