|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/5/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-2958
|
JOB ADDRESS: 6838 SHADOW GLEN FRISCO, TX |
DESC:
3920 AC, 4640 SF, SFR / 2 STORY |
|
OWNER:
TOLL BROTHERS, INC.
2257 SW GRAPEVINE PKWY GRAPEVINE PKWY 100
|
CONTRACTOR:
TOLL BROTHERS, INC.
2257 SW GRAPEVINE PKWY GRAPEVINE PKWY 100
|
ISSUED DATE: 12/12/2012
APPLIED DATE:10/17/2012
EXPIRED DATE:6/10/2013
SITE APN:C2681105
STATUS:COMPLETED
|
|
APPLICANT:
TOLL BROTHERS, INC.
2257 SW GRAPEVINE PKWY GRAPEVINE PKWY 100
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 292471.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 09/10/2013 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 04/16/2013 GU | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
2NDS/FRAMING 04/22/2013 RET | $30.00 |
INSULATION 05/23/2013 RET | $30.00 |
GAS RELEASE 09/24/2013 KSH | $30.00 |
PLAN REVIEW FEE | $50.00 |
BUILDING PERMIT FEE | $1,958.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $267.00 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
RESIDENTIAL ELECTRIC FEE | $139.20 |
Total Fees: | $9,050.45 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ PLUMBING FINAL |
______ LATH |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|