APPROVED DATE: 10/4/2012 PERMIT SUB-TYPE: SNEW PERMIT NO: B12-2741
JOB ADDRESS:
7020 MOUNT HAWLEY RD
FRISCO, TX
DESC:   3494 AC, 4126 SF, SFR / 2 STORY
OWNER:
LANDON HOMES

PLANO TX 75093

CONTRACTOR:
LANDON HOMES

PLANO TX 75093
ISSUED DATE:
11/6/2012
APPLIED DATE:
9/27/2012
EXPIRED DATE:
5/5/2013
SITE APN:
STATUS:
COMPLETED
APPLICANT:
LANDON HOMES

PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
260687.34
FEE SUMMARY
INSPECTION SUMMARY
REPLACE READABLE REGISTER$190.00
RESIDENTIAL ELECTRIC FEE$123.78
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$246.00
BUILDING PERMIT FEE$1,798.75
FENCE FEE$20.00
2NDS/FRAMING 01/09/2013 CW$30.00
CREDIT CARD FEE$3.80
PLUMBTOPOUT/MECHRGH 12/20/2012 GU$30.00
PLUMBTOPOUT/MECHRGH 12/18/2012 JBS$30.00
PLUMBTOPOUT/MECHRGH 12/19/2012 JBS$30.00
T-POLE 11/14/2012 JWI$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
THOROUGHFARE IMPACT FEE$2,502.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
ELECTRICAL ROUGH IN 12/19/2012 MC$30.00
SHEATHING 01/03/2013 MC$30.00
Total Fees:$9,051.33
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  T-POLE
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  WATER REGISTER
______  FLATWORK
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  PLUMBING FINAL
______  PLUMBING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)