|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/26/2012
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B12-2698
|
JOB ADDRESS: 2595 DALLAS PKWY 310 FRISCO, TX 75034 |
DESC:
8036 SQ FT, CIFO / GREATBATCH |
|
OWNER:
HALL STONEBRIAR CENTER I ASSOC
FRISCO TX 75034-8557
|
CONTRACTOR:
COMMERCIAL INTERIORS
IRVING TX 75063
|
ISSUED DATE: 9/28/2012
APPLIED DATE:9/21/2012
EXPIRED DATE:3/27/2013
SITE APN:C2056954
STATUS:COMPLETED
|
|
APPLICANT:
COMMERCIAL INTERIORS
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 460000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FIRE DEPT INSPECTION FEES | $241.08 |
COMMERCIAL BUILDING PERMIT FEE | $1,676.25 |
MISCELLANEOUS ELECTRICAL FEES | $321.44 |
MISCELLANOUS MECHANICAL FEES | $352.00 |
MISCELLANEOUS PLUMBING FEES | $160.00 |
FIRE DEPT INSPECTION FEES | $75.00 |
CREDIT CARD FEE | $2.00 |
FIRE DEPT 1ST INSP FAILED FEE | $50.00 |
CREDIT CARD FEE | $1.00 |
FIRE DEPT INSPECTION FEES | $100.00 |
MECHANICAL ROUGH 11/16/2012 TW | $35.00 |
Total Fees: | $3,013.77 |
|
|
| ______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ COMM PLUMB TOP OUT |
______ COMM FRAME |
______ COMM FRAME |
______ MECHANICAL ROUGH |
______ AUTOFIRE SPRK VISUAL |
______ CEILING |
______ MECHANICAL ROUGH |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK HYDRO |
______ CEILING |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ FIRE FINAL |
______ FIRE FINAL |
______ ELECTRICAL FINAL |
______ COMM CO |
______ ACCESS CONTROL ACCEP |
______ ACCESS CONTROL ACCEP |
______ FIRE FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|