Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/3/2012 PERMIT SUB-TYPE: SNEW PERMIT NO: B12-2662
JOB ADDRESS:
6481 CANYON RANCH RD
FRISCO, TX
DESC:   *MODEL* 4869 AC, 6037 SF, SFR / 2 STORY
OWNER:
AMERICAN LEGEND HOMES
SUITE 222
LEWISVILLE TX 75056

CONTRACTOR:
AMERICAN LEGEND HOMES
SUITE 222
LEWISVILLE TX 75056
ISSUED DATE:
10/10/2012
APPLIED DATE:
9/19/2012
EXPIRED DATE:
1/23/2016
SITE APN:
D561558
STATUS:
COMPLETED
APPLICANT:
AMERICAN LEGEND HOMES
SUITE 222
LEWISVILLE TX 75056
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
363052.26
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$0.60
CREDIT CARD FEE$2.40
CREDIT CARD FEE$1.80
ELECTRICAL FINAL 01/10/2013 GLQ$30.00
PLUMBTOPOUT/MECHRGH 11/16/2012 GU$30.00
GAS RELEASE 01/10/2013 JBS$30.00
RESIDENTIAL ELECTRIC FEE$181.11
MISCELLANOUS MECHANICAL FEES$175.50
MISCELLANEOUS PLUMBING FEES$319.00
BUILDING PERMIT FEE$2,313.75
FENCE FEE$20.00
PLUMBING FINAL 02/11/2013 JTH$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
SEWER IMPACT FEE$1,619.00
THOROUGHFARE IMPACT FEE$3,960.00
WATER IMPACT FEE$1,772.00
SLAB 10/30/2012 REED$30.00
2NDS/FRAMING 11/20/2012 REED$30.00
INSULATION 12/03/2012 REED$30.00
BRICK/WALL TIES 12/03/2012 REED$30.00
GAS RELEASE 01/03/2013 TRC$30.00
Total Fees:$11,065.16
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  T-POLE
______  BRICK/WALL TIES
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  DRY WALL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  T-HEAT
______  FLATWORK
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  ELECTRICAL FINAL
______  CO/BUILDING FINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)