|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/25/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-2639
|
JOB ADDRESS: 13568 MOSSVINE DRIVE FRISCO, TX |
DESC:
3809 AC, 4659 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES
FRISCO TX 75034
|
ISSUED DATE: 9/27/2012
APPLIED DATE:9/18/2012
EXPIRED DATE:3/26/2013
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 289337.58
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 11/12/2012 CW | $30.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $2.40 |
GAS RELEASE 01/02/2013 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $139.77 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $1,943.75 |
FENCE FEE | $20.00 |
INSULATION 11/19/2012 JKT | $30.00 |
PLUMBING FINAL 01/14/2013 JTH | $30.00 |
ELECTRICAL ROUGH IN 11/06/2012 JWI | $30.00 |
ELECTRICAL ROUGH IN 11/06/2012 JWI | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,553.00 |
2NDS/FRAMING 11/09/2012 MC | $30.00 |
FLATWORK 12/12/2012 MC | $30.00 |
MISC ELECTRIC 10/31/2012 RET | $30.00 |
Total Fees: | $9,024.92 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ MISC ELECTRIC |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ FLATWORK |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|