APPROVED DATE: 10/17/2012 PERMIT SUB-TYPE: CNEW PERMIT NO: B12-2567
JOB ADDRESS:
6275 RICHWOODS DR
FRISCO, TX
DESC:   9744 SQ FT, CNEW / RICHWOODS AMENITY CENTER
OWNER:
RICHWOODS AMENITY CENTER HOMEO
C/O RICHWOODS DEVELOPMENT LLC
PLANO TX 75093-3839

CONTRACTOR:
LANDON HOMES
REG EXP 09/30/12
PLANO TX 75093
ISSUED DATE:
10/19/2012
APPLIED DATE:
9/12/2012
EXPIRED DATE:
4/17/2013
SITE APN:
C2687873
STATUS:
COMPLETED
APPLICANT:
LANDON HOMES
REG EXP 09/30/12
PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
900000
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 11/29/2012 MXH$50.00
BRICK/WALL TIES 03/18/2013 CW$35.00
ELECTRICAL ROUGH IN 03/19/2013 CW$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
2 INCH PD METER$280.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$400.00
CREDIT CARD FEE$581.23
CREDIT CARD FEE$3.00
CREDIT CARD FEE$3.80
CREDIT CARD FEE$3.40
CREDIT CARD FEE$0.70
AUTOFIRE SPRK HYDRO 04/08/2013 JCA$50.00
AUTOFIRE SPRK HYDRO 04/11/2013 JCA$100.00
ELECTRICAL RELEASE 05/01/2013 JDSM$35.00
SEWER IMPACT FEE$3,885.00
THOROUGHFARE IMPACT FEE$2,502.00
WATER IMPACT FEE$18,604.00
FIRE DEPT INSPECTION FEES$150.00
FIRE DEPT INSPECTION FEES$360.00
FIRE DEPT INSPECTION FEES$50.00
BRICK/WALL TIES 03/20/2013 TW$35.00
MECHANICAL FINAL 05/16/2013 TW$35.00
MISCELLANEOUS ELECTRICAL FEES$504.20
MISCELLANOUS MECHANICAL FEES$292.00
MISCELLANEOUS PLUMBING FEES$194.00
COMMERCIAL BUILDING PERMIT FEE$3,080.25
ELECTRICAL ROUGH IN 04/10/2013 WKT$35.00
DRY WALL 04/11/2013 WKT$35.00
COMM FRAME 04/15/2013 WKT$35.00
CEILING 04/16/2013 WKT$35.00
DRY WALL 04/19/2013 WKT$35.00
Total Fees:$31,943.58
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 1/2 PD METER
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN VIS
______  UNDRGR FIRE MAIN HYD
______  UNDRGR FIRE MAIN VIS
______  UNDRGR FIRE MAIN FLU
______  UNDRGR FIRE MAIN HYD
______  UNDRGR FIRE MAIN VIS
______  COMM SLAB
______  FOOTINGS
______  FOOTINGS
______  COMM SLAB
______  ELECTRICAL RELEASE
______  SHEATHING
______  PIER
______  MISC MECH
______  PLUMBING ROUGH-IN
______  COMM PLUMB TOP OUT
______  COMM SLAB
______  BRICK/WALL TIES
______  MECHANICAL ROUGH
______  BRICK/WALL TIES
______  ELECTRICAL ROUGH IN
______  BRICK/WALL TIES
______  MECHANICAL ROUGH
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  ELECTRICAL ROUGH IN
______  INSULATION
______  ELECTRICAL ROUGH IN
______  METER PAYMENT
______  ELECTRICAL ROUGH IN
______  SET 1 PD METER
______  AUTOFIRE SPRK HYDRO
______  COMM FRAME
______  MECHANICAL ROUGH
______  INSULATION
______  INSULATION
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  COMM FRAME
______  INSULATION
______  DRY WALL
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK HYDRO
______  COMM FRAME
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  CEILING
______  CEILING
______  DRY WALL
______  DRY WALL
______  ELECTRICAL ROUGH IN
______  ELECTRICAL RELEASE
______  GAS RELEASE
______  ELECTRICAL RELEASE
______  ELECTRICAL RELEASE
______  GAS RELEASE
______  ELECTRICAL RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL ROUGH IN
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  FIRE FINAL
______  FIRE FINAL
______  BUILDING FINAL
______  FIRE FINAL
______  COMM CO
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)