|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/12/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-2524
|
JOB ADDRESS: 13718 MYATT AVE FRISCO, TX |
DESC:
5155 AC, 6055 SF, SFR / 2 STORY |
|
OWNER:
LANDON HOMES
PLANO TX 75093
|
CONTRACTOR:
LANDON HOMES
PLANO TX 75093
|
ISSUED DATE: 9/17/2012
APPLIED DATE:9/7/2012
EXPIRED DATE:3/16/2013
SITE APN:C2682538
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 384614.55
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BRICK/WALL TIES 03/04/2013 CW | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.00 |
CREDIT CARD FEE | $1.20 |
PLUMBTOPOUT/MECHRGH 02/06/2013 GU | $30.00 |
PLUMBING ROUGH-IN 10/04/2012 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $181.65 |
MISCELLANOUS MECHANICAL FEES | $169.00 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
BUILDING PERMIT FEE | $2,418.75 |
FENCE FEE | $20.00 |
FIRE DEPT INSPECTION FEES | $154.65 |
PLUMBTOPOUT/MECHRGH 02/01/2013 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 02/05/2013 JTH | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
REPLACEMENT CARD FEE - CHANGE PLUMBER | $10.00 |
GAS RELEASE 05/24/2013 MC | $30.00 |
Total Fees: | $9,744.85 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ AUTOFIRE SPRK HYDRO |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|