|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/4/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-2477
|
JOB ADDRESS: 6750 SIGMA LN FRISCO, TX 75035 |
DESC:
4603 AC, 5666 SF, SFR / 2 STORY |
|
OWNER:
LANDON HOMES
PLANO TX 75093
|
CONTRACTOR:
LANDON HOMES
PLANO TX 75093
|
ISSUED DATE: 9/17/2012
APPLIED DATE:8/20/2012
EXPIRED DATE:3/16/2013
SITE APN:C2682897
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 343429.83
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $169.98 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
BUILDING PERMIT FEE | $2,213.75 |
FENCE FEE | $20.00 |
INSULATION 01/10/2013 CW | $30.00 |
INSULATION 01/14/2013 CW | $30.00 |
INSULATION 01/15/2013 CW | $30.00 |
DRY WALL 01/23/2013 CW | $30.00 |
ELECTRICAL FINAL 03/19/2013 CW | $30.00 |
CREDIT CARD FEE | $0.80 |
CREDIT CARD FEE | $1.20 |
PLUMBTOPOUT/MECHRGH 11/21/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 11/27/2012 JBS | $30.00 |
GAS RELEASE 03/14/2013 JTH | $30.00 |
ELECTRICAL ROUGH IN 11/21/2012 JWI | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
REPLACEMENT CARD FEE - CHANGE PLUMBER | $10.00 |
2NDS/FRAMING 12/19/2012 MC | $30.00 |
CREDIT CARD FEE | $2.40 |
Total Fees: | $9,437.13 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|