|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/27/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-2333
|
JOB ADDRESS: 4633 CLUB TERRACE LN FRISCO, TX |
DESC:
2548 AC, 3137 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
COPPELL TX 75019
|
ISSUED DATE: 8/29/2012
APPLIED DATE:8/22/2012
EXPIRED DATE:2/25/2013
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 190106.28
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 11/07/2012 GDS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $94.11 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
MISCELLANEOUS PLUMBING FEES | $216.00 |
BUILDING PERMIT FEE | $1,448.75 |
FENCE FEE | $20.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
PLUMBTOPOUT/MECHRGH 11/01/2012 TRC | $30.00 |
CO/BUILDING FINAL 03/26/2013 TW | $30.00 |
CREDIT CARD FEE | $0.60 |
1 INCH PD METER | $355.00 |
WATER METER DEPOSIT | $75.00 |
Total Fees: | $2,395.96 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ FLATWORK |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|