Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/2/2012 PERMIT SUB-TYPE: CIFO PERMIT NO: B12-1826
JOB ADDRESS:
3803 PARKWOOD BLVD #200
FRISCO, TX 75034
DESC:   7498 SQ FT, CIFO / NTSA
OWNER:
SEALY PARKWOOD II LLC
ONE LINCOLN PARK
DALLAS TX 75225-4404

CONTRACTOR:
VERDE VALLEY CONSTRUCTION

DALLAS TX 75254
ISSUED DATE:
8/2/2012
APPLIED DATE:
7/11/2012
EXPIRED DATE:
1/29/2013
SITE APN:
C2608236
STATUS:
COMPLETED
APPLICANT:
NOVE STUDIOS

DALLAS TX 75254
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
180000
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$28.25
CREDIT CARD FEE$1.40
FIRE DEPT INSPECTION FEES$224.94
CREDIT CARD FEE$4.50
FIRE DEPT INSPECTION FEES$75.00
COMM PLUMB TOP OUT 08/23/2012 TRC$35.00
MECHANICAL ROUGH 08/23/2012 TRC$35.00
MISCELLANEOUS ELECTRICAL FEES$322.80
MISCELLANOUS MECHANICAL FEES$149.50
MISCELLANEOUS PLUMBING FEES$104.00
COMMERCIAL BUILDING PERMIT FEE$836.25
Total Fees:$1,816.64
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  COMM SLAB
______  COMM FRAME
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  FLATWORK
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  COMMDRYWALL
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK HYDRO
______  CEILING
______  AUTOFIRE SPRK VISUAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  FIRE FINAL
______  COMM CO
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)