|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/26/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-1478
|
JOB ADDRESS: 10580 BARTLETT FRISCO, TX |
DESC:
4226 AC, 5014 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 6/29/2012
APPLIED DATE:6/12/2012
EXPIRED DATE:12/26/2012
SITE APN:C2678877
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 315301.86
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 07/03/2012 KBO | $50.00 |
ELECTRICAL FINAL 11/09/2012 CW | $30.00 |
ELECTRICAL FINAL 11/16/2012 CW | $30.00 |
ELECTRICAL FINAL 11/20/2012 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
CREDIT CARD FEE | $2.40 |
PLUMBING FINAL 12/14/2012 GU | $30.00 |
PLUMBING ROUGH-IN 07/11/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 09/18/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 09/20/2012 JBS | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $150.42 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
BUILDING PERMIT FEE | $2,073.75 |
FENCE FEE | $20.00 |
GAS RELEASE 11/20/2012 JTH | $30.00 |
GAS RELEASE 11/27/2012 JTH | $30.00 |
PLUMBING FINAL 12/10/2012 JTH | $30.00 |
PLUMBING FINAL 12/13/2012 JTH | $30.00 |
Total Fees: | $3,447.57 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|