|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/24/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-1213
|
JOB ADDRESS: 14285 RUSSELL RD FRISCO, TX 75035 |
DESC:
4164 AC, 5038 SF, SFR / 2 STORY |
|
OWNER:
LANDON HOMES
PLANO TX 75093
|
CONTRACTOR:
LANDON HOMES
PLANO TX 75093
|
ISSUED DATE: 6/11/2012
APPLIED DATE:5/18/2012
EXPIRED DATE:12/8/2012
SITE APN:C2681246
STATUS:COMPLETED
|
|
APPLICANT:
LANDON HOMES
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 310676.04
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $151.14 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $267.00 |
BUILDING PERMIT FEE | $2,048.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
T-POLE 06/29/2012 GDS | $30.00 |
GAS RELEASE 10/09/2012 JBS | $30.00 |
UTILITY / ROW 10/22/2012 KB | $30.00 |
THOROUGHFARE IMPACT FEE | $2,502.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
FLATWORK 10/09/2012 MC | $30.00 |
T-POLE 07/11/2012 REED | $30.00 |
2NDS/FRAMING 08/24/2012 REED | $30.00 |
CREDIT CARD FEE | $0.60 |
PLUMBTOPOUT/MECHRGH 08/17/2012 TRC | $30.00 |
PLUMBTOPOUT/MECHRGH 08/22/2012 TRC | $30.00 |
Total Fees: | $9,188.29 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ T-POLE |
______ T-POLE |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ GAS RELEASE |
______ FLATWORK |
______ GAS RELEASE |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|