|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/30/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-1155
|
JOB ADDRESS: 8803 KELVINGTON DR FRISCO, TX |
DESC:
3748 AC, 4608 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
ISSUED DATE: 10/19/2012
APPLIED DATE:5/15/2012
EXPIRED DATE:4/17/2013
SITE APN:C2649969
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 279638.28
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE READABLE REGISTER | $190.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
PLUMBTOPOUT/MECHRGH 11/27/2012 JBS | $30.00 |
GAS RELEASE 01/14/2013 JBS | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLUMBING FINAL 02/28/2013 JWI | $30.00 |
PLUMBING FINAL 02/28/2013 JWI | $30.00 |
THOROUGHFARE IMPACT FEE | $1,967.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
ELECTRICAL ROUGH IN 11/27/2012 MC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $112.44 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,893.75 |
FENCE FEE | $20.00 |
Total Fees: | $8,659.19 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ WATER REGISTER |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|