|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/15/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-1096
|
JOB ADDRESS: 3988 CATHEDRAL LAKE DR FRISCO, TX |
DESC:
4552 AC, 5821 SF, SFR / 2 STORY |
|
OWNER:
WINDSOR HOMES
DALLAS TX 75214
|
CONTRACTOR:
WINDSOR HOMES
DALLAS TX 75214
|
ISSUED DATE: 6/7/2012
APPLIED DATE:5/9/2012
EXPIRED DATE:12/4/2012
SITE APN:D622233
STATUS:COMPLETED
|
|
APPLICANT:
WINDSOR HOMES
DALLAS TX 75214
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 339624.72
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 09/05/2012 CK | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
2NDS/FRAMING 09/07/2012 GDS | $30.00 |
PLUMBTOPOUT/MECHRGH 08/24/2012 JBS | $30.00 |
PLUMBING FINAL 01/14/2013 JBS | $30.00 |
PLUMBING FINAL 01/16/2013 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $174.63 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
MISCELLANEOUS PLUMBING FEES | $277.00 |
BUILDING PERMIT FEE | $2,193.75 |
FENCE FEE | $20.00 |
THOROUGHFARE IMPACT FEE | $2,469.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
ELECTRICAL FINAL 12/20/2012 REED | $30.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
GAS RELEASE 01/02/2013 TRC | $30.00 |
Total Fees: | $9,403.28 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|