|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/9/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-1033
|
JOB ADDRESS: 12728 WINDING CREEK FRISCO, TX 75035 |
DESC:
2768 AC, 3433 SF, SFR / 1 STORY |
|
OWNER:
MHI - COVENTRY, PLANTATION PIO
1501 LBJ FRWY STE 100 DALLAS TX 75234
|
CONTRACTOR:
MHI - COVENTRY, PLANTATION PIO
1501 LBJ FRWY STE 100 DALLAS TX 75234
|
ISSUED DATE: 5/16/2012
APPLIED DATE:5/3/2012
EXPIRED DATE:11/12/2012
SITE APN:C2647788
STATUS:COMPLETED
|
|
APPLICANT:
MHI - COVENTRY, PLANTATION PIO
1501 LBJ FRWY STE 100 DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 206520.48
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $102.99 |
MISCELLANOUS MECHANICAL FEES | $103.00 |
MISCELLANEOUS PLUMBING FEES | $209.00 |
BUILDING PERMIT FEE | $1,528.75 |
FENCE FEE | $20.00 |
GAS RELEASE 08/31/2012 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 07/05/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 07/06/2012 JBS | $30.00 |
GAS RELEASE 09/04/2012 JTH | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $4,000.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
PLUMBING ROUGH-IN 05/25/2012 MC | $30.00 |
SLAB 06/06/2012 REED | $30.00 |
Total Fees: | $10,037.74 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ FLATWORK |
______ DRY WALL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|