|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/9/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-1015
|
JOB ADDRESS: 12274 POND CYPRESS LN FRISCO, TX |
DESC:
2234 AC, 2698 SF, SFR / 2 STORY |
|
OWNER:
DR HORTON
ROWLETT TX 75088
|
CONTRACTOR:
DR HORTON
ROWLETT TX 75088
|
ISSUED DATE: 5/15/2012
APPLIED DATE:5/2/2012
EXPIRED DATE:11/11/2012
SITE APN:C2592996
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
ROWLETT TX 75088
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 166678.74
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 05/29/2012 CB | $30.00 |
PLUMBTOPOUT/MECHRGH 07/03/2012 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $80.94 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,328.75 |
FENCE FEE | $20.00 |
THOROUGHFARE IMPACT FEE | $1,975.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
1 INCH PD METER | $355.00 |
WATER METER DEPOSIT | $75.00 |
INSULATION 07/19/2012 MC | $30.00 |
Total Fees: | $5,162.69 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|