|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/9/2012
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B12-0628
|
JOB ADDRESS: 5680 FRISCO SQUARE BLVD #2000 FRISCO, TX |
DESC:
3254 SQ FT, CIFO / FOREST PARK VIBRANT SUITE |
|
OWNER:
BHFS I LLC
15601 DALLAS PKWY STE 600 ADDISON TX 75001-6026
|
CONTRACTOR:
GORDON HIGHLANDER
REG EXP 04/30/12 DALLAS TX 75238
|
ISSUED DATE: 4/26/2012
APPLIED DATE:3/20/2012
EXPIRED DATE:10/23/2012
SITE APN:C2656471
STATUS:COMPLETED
|
|
APPLICANT:
BOKA POWELL
DALLAS TX 75231
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 276590
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 07/13/2012 JB | $35.00 |
COPY FEE | $10.60 |
MISCELLANOUS MECHANICAL FEES | $233.50 |
MISCELLANEOUS PLUMBING FEES | $89.00 |
COMMERCIAL ELECTRIC FEE | $130.16 |
COMMERCIAL BUILDING PERMIT FEE | $1,127.25 |
CREDIT CARD FEE | $1.40 |
FIRE DEPT INSPECTION FEES | $95.70 |
FIRE DEPT INSPECTION FEES | $75.00 |
COMM PLUMB TOP OUT 05/17/2012 TRC | $35.00 |
PLUMBING FINAL 07/13/2012 TRC | $35.00 |
Total Fees: | $1,867.61 |
|
|
| ______ ELECTRICAL ROUGH IN |
______ INSULATION |
______ PLUMBING ROUGH-IN |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ PLUMBING ROUGH-IN |
______ COMM FRAME |
______ INSULATION |
______ COMMDRYWALL |
______ MECHANICAL ROUGH |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ CEILING |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ FIRE FINAL |
______ COMM CO |
______ FIRE FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|