|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/25/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-0593
|
JOB ADDRESS: 15160 EDNA FRISCO, TX 75035 |
DESC:
4583 AC, 5563 SF, SFR / 2 STORY |
|
OWNER:
DREES CUSTOM HOMES
6225 SH 161 STE #400 IRVING TX 75038
|
CONTRACTOR:
DREES CUSTOM HOMES
6225 SH 161 STE #400 IRVING TX 75038
|
ISSUED DATE: 6/8/2012
APPLIED DATE:3/23/2012
EXPIRED DATE:12/5/2012
SITE APN:C2645338
STATUS:COMPLETED
|
|
APPLICANT:
DREES CUSTOM HOMES
6225 SH 161 STE #400 IRVING TX 75038
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 314257.32
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FENCE FEE | $20.00 |
RESIDENTIAL ELECTRIC FEE | $166.89 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
PLAN REVIEW FEE | $50.00 |
BUILDING PERMIT FEE | $2,068.75 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
SLAB 07/05/2012 JKT | $30.00 |
PLUMBING FINAL 11/08/2012 JTH | $30.00 |
GAS RELEASE 11/09/2012 JTH | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
SLAB 07/03/2012 REED | $30.00 |
2NDS/FRAMING 08/20/2012 REED | $30.00 |
2NDS/FRAMING 08/20/2012 REED | $30.00 |
PLUMBING ROUGH-IN 06/22/2012 TRC | $30.00 |
Total Fees: | $10,786.14 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ FLATWORK |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|