|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/19/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-0551
|
JOB ADDRESS: 4979 LINDA LN FRISCO, TX |
DESC:
2077 AC, 2935 SF, SFR / 1 STORY |
|
OWNER:
BEAZER HOMES
1750 VALLEY VIEW STE 200 DALLAS TX 75234
|
CONTRACTOR:
BEAZER HOMES
1750 VALLEY VIEW STE 200 DALLAS TX 75234
|
ISSUED DATE: 3/22/2012
APPLIED DATE:3/16/2012
EXPIRED DATE:9/18/2012
SITE APN:D468588
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
1750 VALLEY VIEW STE 200 DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 154964.97
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
REPLACE READABLE REGISTER | $190.00 |
CREDIT CARD FEE | $6.20 |
PLUMBTOPOUT/MECHRGH 04/24/2012 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $88.05 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
MISCELLANEOUS PLUMBING FEES | $190.00 |
BUILDING PERMIT FEE | $1,268.75 |
FENCE FEE | $20.00 |
PLUMBING FINAL 07/06/2012 JTH | $30.00 |
UTILITY / ROW 06/26/2012 KB | $30.00 |
UTILITY / ROW 07/06/2012 KB | $30.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
ELECTRICAL FINAL 06/12/2012 REED | $30.00 |
Total Fees: | $5,897.00 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ WATER REGISTER |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|