|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/13/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-0483
|
JOB ADDRESS: 12793 GRAND VALLEY DRIVE FRISCO, TX 75033 |
DESC:
4108 AC, 4999 SF, SFR / 2 STORY |
|
OWNER:
M CHRISTOPHER CUSTOM HOMES
630 OAKMONT CT FAIRVIEW TX 75069
|
CONTRACTOR:
M CHRISTOPHER CUSTOM HOMES
630 OAKMONT CT FAIRVIEW TX 75069
|
ISSUED DATE: 3/27/2012
APPLIED DATE:3/9/2012
EXPIRED DATE:9/23/2012
SITE APN:D613233
STATUS:COMPLETED
|
|
APPLICANT:
M CHRISTOPHER CUSTOM HOMES
630 OAKMONT CT FAIRVIEW TX 75069
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 306497.88
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL ROUGH IN 05/30/2012 BRL | $30.00 |
SET 1 PD METER 03/30/2012 BXC | $50.00 |
FLATWORK 07/05/2012 CW | $30.00 |
CREDIT CARD FEE | $0.60 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
SLAB 04/18/2012 GLQ | $30.00 |
PLUMBING ROUGH-IN 04/03/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 05/18/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 05/25/2012 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $149.97 |
MISCELLANOUS MECHANICAL FEES | $156.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
BUILDING PERMIT FEE | $2,028.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 06/01/2012 JDSM | $30.00 |
GAS RELEASE 08/01/2012 JTH | $30.00 |
GAS RELEASE 08/06/2012 JTH | $30.00 |
PLUMBING FINAL 08/10/2012 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $3,602.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
CREDIT CARD FEE | $1.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.80 |
Total Fees: | $10,463.72 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|