BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/7/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-0446
|
JOB ADDRESS: 4928 KESSLER DR FRISCO, TX |
DESC:
3349 AC, 4105 SF, SFR / 2 STORY |
|
OWNER:
BEAZER HOMES
1750 VALLEY VIEW STE 200 DALLAS TX 75234
|
CONTRACTOR:
BEAZER HOMES
1750 VALLEY VIEW STE 200 DALLAS TX 75234
|
ISSUED DATE: 3/20/2012
APPLIED DATE:3/7/2012
EXPIRED DATE:9/16/2012
SITE APN:D468570
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
1750 VALLEY VIEW STE 200 DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 249868.89
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 07/24/2012 BRL | $30.00 |
RESIDENTIAL ELECTRIC FEE | $123.15 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $1,743.75 |
FENCE FEE | $20.00 |
T-POLE 04/09/2012 JKT | $30.00 |
PLUMBING FINAL 07/27/2012 JTH | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
ELECTRICAL ROUGH IN 05/16/2012 REED | $30.00 |
Total Fees: | $6,262.40 |
|
|
| ______ T-POLE |
______ T-POLE |
______ T-POLE |
______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ CAMERA |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SHEATHING |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|