Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/6/2012 PERMIT SUB-TYPE: CNEW PERMIT NO: B12-0355
JOB ADDRESS:
14300 KELMSCOT DRIVE
FRISCO, TX
DESC:   468 SQ FT, CNEW / ENTRY GUARD HOUSE / RICHWOODS PH 1
OWNER:
Richwoods Development, LLC
4050 W. Park Blvd.
PLANO TX 75093

CONTRACTOR:
LANDON HOMES

PLANO TX 75093
ISSUED DATE:
3/12/2012
APPLIED DATE:
2/24/2012
EXPIRED DATE:
9/8/2012
SITE APN:
STATUS:
COMPLETED
APPLICANT:
LANDON HOMES

PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
47900
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 03/19/2012 MXH$50.00
MISCELLANEOUS ELECTRICAL FEES$48.08
MISCELLANOUS MECHANICAL FEES$60.00
MISCELLANEOUS PLUMBING FEES$55.00
COMMERCIAL BUILDING PERMIT FEE$374.13
PLAN REVIEW FEE$50.00
CREDIT CARD FEE$1.00
CREDIT CARD FEE$0.50
CREDIT CARD FEE$1.20
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
REPLACEMENT PERMIT FEE$25.00
REPLACEMENT CARD FEE$10.00
FIRE DEPT INSPECTION FEES$100.00
Total Fees:$1,204.91
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  T-POLE
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  BRICK/WALL TIES
______  LMTD ACCSS SEC GATE
______  LMTD ACCSS SEC GATE
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)