Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/15/2012 PERMIT SUB-TYPE: CIFO PERMIT NO: B12-0350
JOB ADDRESS:
15962 ELDORADO PKWY #400
FRISCO, TX 75035
DESC:   4170 SQ FT, CIFO / CICIS PIZZA
OWNER:
ELDORADO CROSSING LLC

DALLAS TX 75205-1175

CONTRACTOR:
BUILDING CONCEPTS OF DALLAS IN

BALCH SPRINGS TX 75780
ISSUED DATE:
3/29/2012
APPLIED DATE:
2/22/2012
EXPIRED DATE:
9/25/2012
SITE APN:
C2684054
STATUS:
COMPLETED
APPLICANT:
Mark D Kiefer / CiCi's Pizza

COPPELL TX 75019
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
250000
FEE SUMMARY
INSPECTION SUMMARY
MISCELLANOUS MECHANICAL FEES$348.00
MISCELLANEOUS PLUMBING FEES$222.50
COMMERCIAL ELECTRIC FEE$166.80
COMMERCIAL BUILDING PERMIT FEE$1,046.25
CREDIT CARD FEE$35.67
CREDIT CARD FEE$0.70
GREASE TRAP 04/06/2012 GU$35.00
FIRE DEPT INSPECTION FEES$75.00
FIRE DEPT INSPECTION FEES$120.03
FIRE DEPT INSPECTION FEES$150.00
PLUMBING ROUGH-IN 04/03/2012 TRC$30.00
PLUMBING ROUGH-IN 04/03/2012 TRC$35.00
COMM PLUMB TOP OUT 04/19/2012 TRC$35.00
COMM PLUMB TOP OUT 04/19/2012 TRC$35.00
MECHANICAL ROUGH 04/26/2012 TRC$35.00
GAS RELEASE 05/10/2012 TRC$35.00
PLUMBING FINAL 05/29/2012 TRC$35.00
Total Fees:$2,439.95
______  PRECON CONF
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  GREASE TRAP
______  ELEC WALL
______  GREASE TRAP
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  GREASE TRAP
______  GREASE TRAP
______  COMM SLAB
______  INSULATION
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  DRY WALL
______  COMM PLUMB TOP OUT
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  ELECTRICAL RELEASE
______  CEILING
______  ELECTRICAL RELEASE
______  ELECTRICAL ROUGH IN
______  GAS RELEASE
______  GAS RELEASE
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  CEILING
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  COURTESY HEALTH INSP
______  AUTOFIRE SPRK VISUAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  FIRE FINAL
______  HEALTH FINAL
______  COMM CO
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)