BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/26/2012
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B12-0336
|
JOB ADDRESS: 15922 ELDORADO PKWY FRISCO, TX |
DESC:
19880 SQ FT, CNEW / CUSTER STAR RETAIL A SHELL |
|
OWNER:
ELDORADO CROSSING LLC
DALLAS TX 75205-1175
|
CONTRACTOR:
RIDGEMONT COMMERCIAL CO
received application IRVING TX 75038
|
ISSUED DATE: 7/9/2012
APPLIED DATE:2/20/2012
EXPIRED DATE:1/5/2013
SITE APN:C2660691
STATUS:COMPLETED
|
|
APPLICANT:
HODGES AND ASSOCIATES
DALLAS TX 75244
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 994000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
2 INCH PD METER | $635.00 |
SEWER IMPACT FEE | $12,950.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $14,174.00 |
T-POLE 08/31/2012 RET | $35.00 |
ELECTRICAL RELEASE 12/18/2012 RET | $35.00 |
MISCELLANEOUS ELECTRICAL FEES | $497.12 |
FIRE DEPT INSPECTION FEES | $0.92 |
FIRE DEPT INSPECTION FEES | $50.00 |
FIRE DEPT INSPECTION FEES | $565.00 |
FIRE DEPT 1ST INSP FAILED FEE | $50.00 |
FIRE DEPT INSPECTION FEES | $50.00 |
MISCELLANOUS MECHANICAL FEES | $37.00 |
MISCELLANEOUS PLUMBING FEES | $250.00 |
COMMERCIAL BUILDING PERMIT FEE | $3,348.15 |
COMM SLAB 09/12/2012 WKT | $35.00 |
Total Fees: | $32,787.19 |
|
|
| ______ T-POLE |
______ T-POLE |
______ COMM SLAB |
______ COMM SLAB |
______ TILT WALL PANELS |
______ FOOTINGS |
______ ELECTRICAL ROUGH IN |
______ COMM SLAB |
______ FOOTINGS |
______ COMM FRAME |
______ INSULATION |
______ COMM PLUMB TOP OUT |
______ PLUMBING ROUGH-IN |
______ BRICK |
______ COMM FRAME |
______ BRICK |
______ UNDRGR FIRE MAIN FLU |
______ UNDRGR FIRE MAIN HYD |
______ UNDRGR FIRE MAIN VIS |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PAVING |
______ METER PAYMENT |
______ SET 2 PD METER |
______ ELECTRICAL RELEASE |
______ ELECTRICAL |
______ PLUMBING FINAL |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ MECHANICAL FINAL |
______ FIRE FINAL |
______ FIRE FINAL |
______ FIRE FINAL |
______ BUILDING FINAL |
______ FIRE FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|